4rm heating

 

new Boiler

  • AQ—Boiler to replace 

— 25 JUNE

NS—remove basement boxing-in panel / fix ply to hall for vertical run

AWL / AQ / others—can store tank, boiler, copper, etc, in 1RM ground back

 

future Rads

  • AQ (+ to quote)—mezzanine bathroom rad to sort

(nb we are knocking through to wc)

  • AQ (+ to quote)—provide for rads to front basement and knocked through mezz bathroom

(ie two rads would need to be replaced with one)

  • AQ—basement zone stubs to front cellar

(nb we are converting in 2020)