4rm heating
new Boiler
AQ—Boiler to replace
— 25 JUNE
NS—remove basement boxing-in panel / fix ply to hall for vertical run
AWL / AQ / others—can store tank, boiler, copper, etc, in 1RM ground back
future Rads
AQ (+ to quote)—mezzanine bathroom rad to sort
(nb we are knocking through to wc)
AQ (+ to quote)—provide for rads to front basement and knocked through mezz bathroom
(ie two rads would need to be replaced with one)
AQ—basement zone stubs to front cellar
(nb we are converting in 2020)