• NS—Remove basement boxing-in panels

— Start 18/6

  • NS—Ply to hall for vertical run

760 wide, floor to ceiling (cut skirting neatly, keep offcut)

— Start 18/6

  • NS—4RM garage tall tool stores—

Andrew to design – left: w 640, d 650 (incl 600 door) / right: w 615, d 650 (incl 600 door) / doors facing each other on inner face

  • NS / PM—board & skim insulated stairwell ceiling—

off internal scaffold

incorporate ducting from top landing 

  • NS—Box-in stairwell ducting—

matchboard and corner bead (as in 1RM)

  • NS—Firedoors—

1 x attic bathroom / 2 x attic bedroom (2 days per door ?)

  • NS / AWL—Curtain poles—

Which rooms – ??? / NOT telescopic

  • NS—Door handles—

Andrew to decide where needed

  • NS—Timberwork to front door canopies—

with NMcG / GW

  • NS—Repair dormers & new gutter fascia board—

with NMcG / GW

  • NS—Hallway boxing-in to vertical run

after all electrics, ducting and pipework is done / incorporate 30 inch door

  • AWL—Remove bolts from front door